Solar Makeover for BP Spar Fall Ings
Located next to River Calder in Wakefield, the 100 kWh rooftop solar system is expected to save £425,000 and 1375 Tons of CO2 over the 25 years, offsetting 33% of the site’s energy needs with only solar energy.
The site operates 24/7 and includes Spar, Costa Express & Car Washing facilities. Serving hundreds of customers and fuelling thousands of vehicles every day, the site consumes 524 kWh of energy on an average day. The site is entirely dependent on the grid for all its electrical needs.
This system includes 348 Tier 1 German manufactured solar panels in South-East orientation. The recommended design included panels’ installation on the building roof as well as the fuel station canopy with custom mounting and design for the canopy, ensuring the highest level of safety possible.
U Energy Solar has completed work for us on dozens of sites with no problems whatsoever. They are good because they fine-tune systems to our needs with efficiency and have significantly reduced energy consumption. They are highly recommended.
Haroon Valli
Chairman & CEO – Valli Forecourts
Free of charge site analysis, system design and system performance metrics for Solar Energy, Battery Storage, LED Lighting & EV Charging solutions.