BP Stockton chooses U Energy for 100kW install
Saving an estimated £228,000 over 25 years with U Energy, while offsetting approximately 70% of electricity, BP Reliance Stockton is taking advantage of the leading-edge solar technology provided by U Energy Solar. The solar system is estimated to generate 2 MWh of electricity, reducing carbon footprint by 1,500 Tons, over the 25-year warranted life span of the solar panels.
Located in Stockton-on-tees, UK, the site is open 24/7, serving hundreds of customers every day. The fuel station building accommodates BP, Subway, Spar and Costa Express. The site also comprises of fuel station canopy and separate Car Wash area.
The rooftop of the building and canopy is fully utilised to release maximum solar potential. In total, 348 solar panels were installed along with 5 inverters and over 5 kilometres of cables. The system installation was completed within 4 days, with the project being complete within 14 days of initial inquiry.
U Energy Solar has completed work for us on dozens of sites with no problems whatsoever. They are good because they fine-tune systems to our needs with efficiency and have significantly reduced energy consumption. They are highly recommended.
Haroon Valli
Chairman & CEO – Valli Forecourts
Free of charge site analysis, system design and system performance metrics for Solar Energy, Battery Storage, LED Lighting & EV Charging solutions.